March 28, 2006

  • As noted it the last comments things are moving along well.  We have the to do list from our buyers and it is “do-able”.  We were worried because of some of the things the inspector came up with.  He was a nightmare not only for us but for the buyer as well.  We were afraid his 15 page report was going to scare them off.  Some of the items were so ridiculous it was annoying.  Like Brian mentioned, bumpers in the garage to prevent cars from hitting the washer and dryer.  Brian is taking at least one full day this week to complete termite repairs and the list items.  The termite treatment and inspections will all take place this weekend.  Hopefully that is all we will have to to with the house and then we can concentrate on packing.  Our buyer is interested in most of our furnishings and so we will be taking a lot less with us.  A lot of shopping awaits us when we return from our trip.  We have signed escrow papers and sent them in.  I am sure they will send us more.  It seems to be a never ending process. 


    As far as the new house goes, as far as I know escrow started Monday and is contingent on the sale of our Santa Paula property closing without any hitches.  We spent some time there Saturday taking pictures and measurements.  It is really hard to not go out and start buying new stuff for the place.  We will not be there officially until May 19th.  But when the time comes our address is:  8876 Sparkling Creek Ave.  Las Vegas, NV  89143.  I won’t know home phone #’s until then as well.  You can still reach us via cell phone though:  Pam  702-374-7997 and Brian 702-445-4885.


    Here are some pictures of the place:


     


    The front yard


     


    The back yard


     


    The front door looking out.


     


    Various living room and kitchen shots.


     


    entry way and stairs


     


    pot shelves in stair well and crown molding detail


     


    crown molding and cabinet detail


       


    brian’s downstairs office, downstairs half bath and cabinets ( all kitchen cabinets have rollout top shelves)


     


    kitchen sink with splash guard and granite countertops, upstairs kid bathroom


       


    master bedroom and walkin closet


     


    master bathroom


       


    Our sweet girls

Comments (9)

Post a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Categories